Delegation handoff audit

Map every task only you can do, rebuild each handoff with a four-part brief, and stop redoing work that comes back wrong. An AI skill to run every quarter.

“the work comes back wrong. Not terrible -- just not how you'd do it... Multiply that by 50 tasks a week and you've built a prison out of your own competence.”
Solveline

The problem

Delegated work keeps coming back wrong because the handoff was handed over, not designed. This system maps every task that depends on you alone, rebuilds the next handoff with a four-part acceptance brief, and documents the process once a task has run twice. A quarterly re-audit keeps the dependency list honest instead of letting it go stale.

Delegation handoff audit

Key takeaways

  • List everything that would stall or slow down if you were unreachable for two weeks; that list is your real dependency map, not a guess.
  • Score each item on whether customers buy from you personally, whether the process lives only in your head, and how much of your week goes to approving versus building.
  • A handoff usually fails for one of six reasons: a vague outcome, you keeping the decision rights, tribal knowledge, incomplete inputs, no single named owner, or unstated tools and reporting expectations.
  • Fix the handoff before it goes out with a four-part brief: the outcome stated as a result, one named accountable owner, the decision boundaries, and the acceptance conditions you'll check the work against.
  • Don't write the SOP from a task's first run; a process that has only run once still describes the exception, not the rule.
  • Rerun the dependency audit every quarter. The list only stays useful if it gets updated on a schedule, not rebuilt from zero when you remember.
SKILL.md

Frontmatter

name
delegation-handoff-audit
description
Runs a recurring bus-factor audit that maps every task only the owner can do, rebuilds each handoff with a four-part acceptance brief so delegated work stops coming back wrong, and installs a documentation rule plus a standing re-audit cadence. Use when the user reports that delegated work keeps coming back wrong, that they cannot step away from the business for more than a day or two, that a new hire or contractor needs a task handed off and documented, or that they want a current list of what only they personally can do. Triggers include "this came back wrong again", "I had to redo what I delegated", "I can't take a vacation without the business falling apart", "nobody else knows how to do this but me", "how do I write this up before I hand it off".

Delegation handoff audit

This skill runs a standing dependency audit and handoff-redesign system for an owner-led business. It maps every task that currently depends on the owner alone, rebuilds the next handoff of that task with a four-part acceptance brief, and installs the documentation and re-audit cadence that keeps the map current. Invoke it when the user reports delegated work coming back wrong or incomplete, cannot cover for themselves for more than a day or two, is about to hand a recurring task to a new hire or contractor, or wants a current list of what only they personally can do.

The bundle carries the mechanics this procedure runs on: references/bus-factor-audit.md (the two-week dependency test and its scoring rubric), references/handoff-redesign.md (the six-point failure lens and the four-part handoff brief template), references/documentation-rule.md (the first-run-versus-second-run rule and the SOP template it produces), and references/continuity-checklist.md (the structural, legal, and financial items a checklist cannot replace on its own). examples/audit-filled-example.md and examples/handoff-brief-example.md show both artifacts filled in for a real task, for the agent to match in shape and specificity, never as a source of facts for this user's business.

Phase 1: Map the dependency list (run once, then every quarter)

  1. When the user wants to know what only they can do, or reports a bus factor of one, open references/bus-factor-audit.md and walk the user through the two-week test: list everything that would stall or slow down if the user were unreachable for two weeks, restricted to tasks only the user can do, access, or is trusted to approve. Record each item as its own line, not a vague category ("sales" is not an item; "approving every quote over $2,000" is).
  2. For each item on the list, apply the ownership-dependency diagnostic in references/bus-factor-audit.md: do customers buy from the owner personally or from the company, does the process exist only in the owner's head, does anyone besides the owner have real authority to decide it, and how much of the owner's week goes to reviewing and approving versus building and selling. Score each item against the rubric in that file.
  3. Sort the scored list highest-risk first (most owner-bound, most frequent, most customer-facing) and check the entries against examples/audit-filled-example.md for the level of specificity expected, a pattern to match, not a source of facts for this business. Present the sorted list to the user as the working dependency map. Do not rank by gut feel instead of the rubric; the rubric is what keeps the list honest.
  4. Store the dependency map somewhere the user can return to it (a doc, a sheet, a pinned note), dated. This file is what Phase 4's quarterly re-audit updates rather than rebuilds from zero.
  5. Ask the user which item on the list they want to fix first. That item is what Phase 2 runs on next.

Phase 2: Redesign the handoff before it goes out (run every time a task moves)

  1. When the user is about to delegate, or re-delegate after work came back wrong, an item from the dependency map, open references/handoff-redesign.md and check the task against its six failure points: is the outcome described as a result or only as activity, does the owner still hold the decision rights, does the process live only in the owner's head, are the inputs complete and arriving through a defined channel, is exactly one person named as accountable, and are the tool and status-reporting expectations stated. Name which of the six is actually broken; do not assume the delegate simply was not careful enough.
  2. Fill the four-part handoff brief template in references/handoff-redesign.md for this task: the outcome (what done looks like, stated as a result, not a to-do list), the one named accountable owner, the decision boundaries (which calls the delegate can make alone and which must come back to the user first), and the acceptance conditions (what the user checks before calling the work done). Pull every detail from what the user actually told you about the task; never invent a deadline, a budget figure, or a scope boundary that was not given.
  3. Compare the filled brief against examples/handoff-brief-example.md for shape and specificity, not for content; the example is a pattern to match, never a source of facts for this task.
  4. Present the completed handoff brief to the user for approval before anything goes to the delegate. This is a send-gated step: do not message, email, or otherwise hand the brief to the employee or contractor on the agent's own initiative. Wait for the user's explicit yes in this turn before treating the brief as final.
  5. On approval, give the user the approved brief to deliver through their own channel (in person, their email, their project tool). This skill drafts the handoff; it never delivers it.
  6. Log the task, the date handed off, and the acceptance conditions somewhere the user can check back against when the work comes back. This log is what Phase 3 checks on the task's next repeat.

Phase 3: Document on the second repeat (run every time a delegated task recurs)

  1. When the user reports that a task they handed off has now run a second time, whether it came back right or wrong, open references/documentation-rule.md. Do not write an SOP from a task's first run; a process that has only run once is still unstable, and an SOP written from it usually describes the exception, not the rule.
  2. On the second run, interview the user for what actually happened both times: the steps taken, the places the delegate asked a question or guessed, and any point where the result diverged from what the user wanted. Write the SOP from what was observed, not from how the user imagines the task should go in theory.
  3. Use the SOP template in references/documentation-rule.md. Each step states the action, the input it needs, and the check that confirms it was done correctly. Build in the feedback line from that file: the delegate is told to flag anything unclear in the SOP itself, not just to ask about the task, so the correction lands in the document and not only in that one conversation.
  4. Present the drafted SOP to the user for approval before it is treated as the standing procedure. Once approved, this SOP replaces the handoff brief for that specific task going forward: future handoffs of this task point to the SOP instead of being rebuilt from scratch.

Phase 4: Install the standing cadence (run on a fixed schedule, not on request)

  1. Set, with the user, a recurring quarterly date to re-run Phase 1 on the dependency map: re-score every existing item (has it moved to a documented SOP, is it still owner-bound) and add anything new that surfaced since the last audit. This is the step that keeps the map from going stale; a map built once and never revisited describes a business that no longer exists.
  2. At the same cadence, check which items on the dependency map have never produced a second repeat, so Phase 3 could never trigger on them, and flag those to the user by name. A task that never gets handed off twice is a task the user is still quietly doing themselves.
  3. Once a year, or when the user mentions wanting real time away from the business, open references/continuity-checklist.md and walk the user through the structural layer: a stay-bonus or retention arrangement for whoever would run the business during an unplanned absence, advance disclosure of a continuity plan to the business's bank or lenders, and pre-authorizing a named person to act on operational or financial decisions during an absence. State plainly that these are legal and financial instruments, not documents this skill can draft; point the user to an attorney, an insurance advisor, or their accountant for each one. Never draft a legal authorization, an insurance arrangement, or a bank disclosure letter in place of that professional.

Copy-paste checklist: before any task gets handed off

  • Task is on the dependency map (or added to it if new)
  • Outcome is stated as a result, not a list of activities
  • Exactly one person is named as accountable
  • Decision boundaries are written down (what needs the owner, what doesn't)
  • Acceptance conditions are written down before the work starts
  • Brief shown to the owner and approved before it reaches the delegate
  • If this is the task's second run, the SOP gets written from what happened, not from a guess

Copy-paste checklist: quarterly re-audit

  • Every existing dependency-map item re-scored
  • Items that moved to a documented SOP marked done
  • New owner-bound tasks added to the map
  • Tasks still stuck on a first run (never reached a documented SOP) flagged by name
  • Continuity-layer items (stay bonus, advance authorization, bank disclosure) checked once a year, referred to a professional, never drafted by this skill

Guardrails: what this skill must never do

  • Never fabricate a detail (a deadline, a budget, a scope line, a customer name) that the user did not provide. Pull every fact in a handoff brief or SOP from what the user actually said.
  • Never send, deliver, or post a handoff brief, SOP, or any other drafted text to a delegate, employee, or contractor. Every send-gated step ends in a draft shown to the user, approved in that turn, and handed back to the user to deliver.
  • Never write an SOP from a task's first run. Wait for the second repeat; a one-off description is not yet a procedure.
  • Never draft a legal authorization, insurance arrangement, or bank or lender disclosure. These are the continuity checklist's structural items and belong to an attorney, insurance advisor, or accountant; this skill's job stops at naming them and routing the user to that professional.
  • Never treat a stale dependency map as current. If the last audit is more than a quarter old, say so before using it, and prompt the Phase 4 re-audit rather than proceeding on outdated information.
  • Never blame the delegate for work that came back wrong without first checking the six failure points in Phase 2; most "they didn't do it right" reports trace back to an outcome that was never defined, not to the person who tried to meet it.

Install

  1. Download the .skill bundle, or the raw SKILL.md above.
  2. Unzip the bundle into your agent's skills directory. SKILL.md sits at the top level; any reference files sit beside it.
  3. Point your agent at the folder. It reads SKILL.md and follows it.

What's in the bundle

The .skill download contains SKILL.md plus these files, each at its path.

SKILL.mdthe skill on this page
references/bus-factor-audit.md4,322 chars
# The two-week dependency test and scoring rubric

Use this to build the first dependency map, and again every quarter to refresh it.

## The two-week test

Imagine you are unreachable for two weeks: no calls, no texts, no email replies. Walk through a normal two-week stretch of the business and write down everything that would stall, slow down, or go wrong because you specifically were not there to do it, approve it, or answer a question about it.

Rules for the list:

- One line per item, not a category. "Sales" is not an item. "Approving every quote over $2,000" is an item. "Quarterly tax filing" is not an item. "Reviewing the bookkeeper's numbers before they get filed" is an item.
- Only list things that depend on you personally: your access, your signature, your knowledge, your relationship with a specific customer or vendor, or your judgment call. If someone else already owns it end to end and just happens to loop you in out of habit, that is a different problem (a habit to break, not a dependency to fix) and does not belong on this list.
- Write it down even if it feels small. A five-minute approval that happens nine times a week is a bigger dependency than a two-hour task that happens once a quarter.

Aim for at least 15 to 20 items on the first pass. If you get fewer than 10, you have probably been grouping things into categories instead of listing the actual tasks. Go back through a real week's calendar, inbox, and phone log and pull out what you touched.

## The ownership-dependency diagnostic

Score every item on the list against these four questions. Use the 0 to 3 scale under each question, then add the four numbers for a total score out of 12.

**1. Who does the customer think they're buying from?**
- 0: The company. The customer has never asked for you by name.
- 1: Mostly the company, but you've stepped in a few times.
- 2: You, with the company as a secondary relationship.
- 3: You personally. If you left, this customer believes the relationship ends.

**2. Where does the process live?**
- 0: Written down somewhere (a doc, an SOP, a checklist) that someone else could follow today.
- 1: Mostly written down, with a few steps only you know.
- 2: Lives mostly in your head, with scattered notes.
- 3: Lives entirely in your head. Nothing is written down anywhere.

**3. Does anyone else have real authority to decide this?**
- 0: Yes. Someone else can make this call and it sticks, no check-in with you required.
- 1: Someone else can decide it below a stated threshold (a dollar limit, a scope limit).
- 2: Someone else can decide it, but in practice always checks with you first.
- 3: No. Only you can make this call, formally or by habit.

**4. How much of your week does this cost you, reviewing and approving versus building and selling?**
- 0: Under 15 minutes a week.
- 1: 15 to 60 minutes a week.
- 2: 1 to 3 hours a week.
- 3: Over 3 hours a week.

**Total score (0 to 12) and what it means:**

| Score | Read it as |
|---|---|
| 0 to 3 | Low risk. Not urgent, revisit next quarter. |
| 4 to 7 | Medium risk. Worth redesigning in the next month. |
| 8 to 12 | High risk. This is a task where the business genuinely cannot run without you right now. Fix this one first. |

Do not substitute gut feeling for the score. The point of the rubric is that a task you personally enjoy (and therefore want to believe is "fine to keep doing") gets scored the same as any other task. If it scores 8 or higher, it goes near the top of the list regardless of how much you like doing it.

## Sorting and storing the map

1. Sort the scored list highest total first.
2. Within a tie, put the more customer-facing and more frequent item higher.
3. Check your sorted list against `examples/audit-filled-example.md` for the level of detail expected. That file is a pattern to match for specificity, not a source of facts for your business; none of its numbers or task names are yours.
4. Save the dated list somewhere you'll actually reopen it (a shared doc, a spreadsheet, a pinned note). Date the file name or the top line ("Dependency map, reviewed 2026-10-06") so the next quarterly pass knows what it's updating instead of rebuilding from scratch.
5. Pick the single highest-scoring item to redesign first. One handoff at a time beats trying to fix the whole list in a week.
references/handoff-redesign.md3,454 chars
# The six-point failure lens and the four-part handoff brief

Use this before any task moves to someone else, whether it's the first handoff or a re-handoff after work came back wrong.

## The six-point failure lens

Before writing a new brief, check the task (or the last attempt at delegating it) against these six points. Name which ones are actually broken. Most failed handoffs trace back to one or two of these, not all six.

1. **Outcome versus activity.** Was the person told what "done" looks like as a result ("the customer has a signed quote and a scheduled start date"), or just handed a list of things to do ("call the customer, send the quote, follow up")? A list of activities can be completed perfectly and still miss the outcome.
2. **Decision rights.** Did the person actually get to decide anything, or did every real call still route back to you? If every judgment call still needs your sign-off, you haven't delegated the task, you've delegated the typing.
3. **Where the process lives.** Was the method written down somewhere the person could check, or did they have to guess at steps that only exist in your head?
4. **Inputs and channel.** Did the person have everything they needed (numbers, access, prior history with the customer) before they started, arriving through one defined place (an email, a shared doc, a ticket), or did they have to chase down pieces as they went?
5. **One named owner.** Is exactly one person accountable for this task, or is it "the team" or "whoever has time"? A task owned by a group is a task nobody actually owns.
6. **Tools and status reporting.** Does the person know which tool to use and when and how to report status, or are you finding out the task is behind by asking?

Write down which of the six failed. If the brief below doesn't fix that specific point, it will fail the same way again.

## The four-part handoff brief

Fill in each part using only what you actually know about this task. Never invent a deadline, a dollar figure, or a scope boundary you haven't actually set; leave it blank and go find the real number instead.

```
TASK: [the one task from the dependency map]
DATE DRAFTED: [date]

1. OUTCOME (a result, not a to-do list)
When this is done, what exists that didn't before? Describe the end state,
not the steps to get there.

2. ACCOUNTABLE OWNER
Exactly one name. Not a team, not a role left to whoever's free.

3. DECISION BOUNDARIES
What can [owner] decide alone, no check-in needed?
-
-

What must come back to [you] before it moves forward?
-
-

4. ACCEPTANCE CONDITIONS
What will you personally check before you call this done?
-
-
-
```

A filled example of this exact template, for a real task, is in `examples/handoff-brief-example.md`. Match its shape and level of detail; it is a pattern, not a source of facts for your task.

## Before this brief goes anywhere

- The brief is not final until it has been reviewed and approved. Nothing goes to the delegate until that approval happens.
- Once approved, deliver it through your own channel (in person, your email, your project tool). This brief is a draft to approve and hand off yourself, not something sent on anyone's behalf.
- Log the task, the date it was handed off, and the acceptance conditions somewhere you can check back against when the work is due. You'll need this log the next time this same task comes around, to see whether it needs documenting (see `references/documentation-rule.md`).
references/documentation-rule.md2,587 chars
# The first-run-versus-second-run rule

## Why the first run doesn't get written up

A task that has only run once is still unstable. The first time someone does a handed-off task, you're watching for whether the brief itself was right: was the outcome clear, did decision rights land where they should, were the inputs complete. Writing a standard procedure from a single run usually just writes down whatever happened to go wrong (or right) that one time, which is the exception, not the rule.

Wait for the second run. On the second time this exact task comes around, whether it went well or came back wrong, that's when you write the SOP.

## What to do on the second run

1. Interview whoever ran the task both times (yourself, if it was you, or the delegate). Ask specifically:
   - What were the actual steps taken, in order, both times?
   - Where did the person pause, ask a question, or guess?
   - Where did the result diverge from what you actually wanted?
2. Write the SOP from what was observed on those two runs, not from how you imagine the task should go in theory. If step 4 on paper is "confirm the measurements," but in practice the person always double-checks with the customer by text first, write down the text-check. The real process beats the idealized one.

## The SOP template

Each step states the action, what it needs as input, and the check that confirms it was done right.

```
SOP: [task name]
OWNER: [accountable person, from the handoff brief]
LAST UPDATED: [date]

STEP 1
Action:
Input needed:
Check (how you know this step was done correctly):

STEP 2
Action:
Input needed:
Check:

[... one block per step, in the order they're actually done ...]

FEEDBACK LINE
If anything in this SOP is unclear or doesn't match what actually happens,
write the correction directly into this document (don't just mention it
in conversation). Note what changed and the date.
```

The feedback line matters as much as the steps. If the delegate only ever raises a question verbally, the correction lives in that one conversation and the next person who runs the task hits the same confusion. Writing it into the document is what keeps the SOP current instead of slowly going stale.

## Approval and what happens after

Show the drafted SOP to whoever owns this task area before it becomes the standing procedure. Once approved, this SOP replaces the handoff brief for this specific task going forward. The next time this task is handed off (a new hire, a different contractor, a vacation fill-in), you point them to the SOP instead of writing a fresh brief from zero.
references/continuity-checklist.md3,581 chars
# The continuity checklist: what a checklist alone can't replace

Run this once a year, or any time you start seriously thinking about taking real time away from the business. These three items sit a level above task handoffs and documented SOPs: they're structural, legal, and financial instruments, not procedures you can write yourself. This checklist tells you which professional to call for each one; it does not draft any of them.

## 1. A stay arrangement for whoever runs things in an unplanned absence

If you were out for two weeks with no warning, is there a specific person who would run day-to-day operations, and do they have a reason to stay and do it well (a retention bonus, a defined temporary pay bump, a clear path to a bigger role if it goes well)? Without that arrangement, the person most able to keep things running during a crisis has the least reason to stick around during one.

- [ ] A specific person is named for this, not "whoever's senior."
- [ ] That person knows they're the one, in writing.
- [ ] There's a financial or career reason for them to stay through a rough stretch, not just goodwill.

**Who to involve:** an employment attorney or an HR advisor, to structure this correctly and avoid creating a legal obligation you didn't intend.

## 2. Advance disclosure to your bank or lenders

If you have a business loan, a line of credit, or a lease that names you personally, check whether the agreement has a key-person clause or a change-of-control trigger, and whether your lender already knows there's a continuity plan in place. A lender who is surprised by your absence behaves very differently from one who was told the plan in advance.

- [ ] You've pulled the actual loan and lease documents and checked for key-person or change-of-control language.
- [ ] Your banker or lender has been told, in advance, who takes over and how.
- [ ] Any required notice period for a change in ownership or management is known, not assumed.

**Who to involve:** your accountant and your banker directly; a business attorney if the loan documents have unclear or restrictive language.

## 3. A named person pre-authorized to act during an absence

If something happened to you tomorrow, could anyone sign a check, approve a wire, access the business bank account, or make a binding decision on the company's behalf, legally? Most owner-led businesses have no one pre-authorized for this, which means routine operations (payroll, vendor payments, signing a renewal) stop the moment you're unreachable, not just the judgment calls.

- [ ] A specific person has been granted operational or financial authority to act in your absence (a power of attorney, a bank-authorized signer, an operating agreement amendment, whichever applies to your structure).
- [ ] That authorization is on file with the bank or institution that would need to honor it, not just in a drawer.
- [ ] You've confirmed with your insurance advisor whether a key-person policy makes sense given what this absence would actually cost the business.

**Who to involve:** a business or estate attorney to draft the authorization correctly, your insurance advisor for the key-person question, your accountant to confirm it's reflected correctly in the company's records.

## What this checklist is not

This is a list of what to ask for, not a legal document. Do not treat any box you check here as the authorization, the disclosure, or the policy itself. Each one needs the named professional above to actually exist. Checking a box without making the call is the same as not checking it.
examples/audit-filled-example.md1,984 chars
# Worked example: a filled dependency map (one task)

This shows the level of detail and the scoring expected from `references/bus-factor-audit.md`. The business, the person, and the numbers below are illustrative only: a pattern to match for specificity, not facts to copy into your own map.

**Business:** a 9-person commercial landscaping company.
**Owner:** Dana.
**Task from the two-week list:** "Approving every change order over $1,500 on an active job."

## Scored against the ownership-dependency diagnostic

**1. Who does the customer think they're buying from?**
Score: 1. Most commercial clients deal with the project manager day to day. Dana only gets looped in for the change-order sign-off itself, not the relationship.

**2. Where does the process live?**
Score: 3. There is no written threshold logic. Dana eyeballs each change order against the original bid and her sense of the client's budget tolerance, something she has never written down.

**3. Does anyone else have real authority to decide this?**
Score: 3. The two project managers both route every change order to Dana regardless of size, because the $1,500 line was never formally delegated to them.

**4. Time cost per week?**
Score: 2. Averaging 4 to 6 change orders a week at roughly 15 to 20 minutes each (reviewing the bid, texting a project manager with questions, approving or sending back), this runs just over 1.5 hours most weeks.

**Total: 9 out of 12. High risk.**

## Why this one gets fixed first

At a score of 9, this task sits above several others on Dana's list (vendor contract renewals scored 5, new-hire onboarding scored 4) because it is weekly, not quarterly, and because the lack of a written threshold means every project manager defaults to "ask Dana" even on change orders that are clearly within normal bid variance. This is the item Dana picks to run through Phase 2 (the handoff redesign) next. See `examples/handoff-brief-example.md` for the brief built from this exact task.
examples/handoff-brief-example.md2,502 chars
# Worked example: a filled four-part handoff brief

Built from the task in `examples/audit-filled-example.md` ("approving change orders over $1,500"), using the template in `references/handoff-redesign.md`. The names and numbers are illustrative; match the shape and the level of detail, not the content.

```
TASK: Approving change orders over $1,500 on an active landscaping job
DATE DRAFTED: 2026-09-14

1. OUTCOME (a result, not a to-do list)
The client has a signed, itemized change order on file before any additional
work starts, and the job's budget variance stays inside 12% of the original
bid unless Dana has specifically approved going over that.

2. ACCOUNTABLE OWNER
Marcus (senior project manager, 6 years with the company)

3. DECISION BOUNDARIES
What can Marcus decide alone, no check-in needed?
- Any change order under $3,000 that keeps the job's total budget variance
  inside 12% of the original bid
- Change orders requested in writing by the client (email or signed form),
  regardless of amount, as long as the 12% variance line holds

What must come back to Dana before it moves forward?
- Any change order, of any size, that would push the job's total budget
  variance past 12% of the original bid
- Any change order the client is requesting verbally with no written
  confirmation yet

4. ACCEPTANCE CONDITIONS
What will Dana personally check before she calls this done?
- The signed change order is in the shared job folder before work starts
- The running budget-variance number for the job is updated the same day
- Any change order Marcus approved alone is logged with the client's written
  request attached, so Dana can spot-check a sample each month
```

## What happened after this brief was approved

Dana reviewed and approved this brief, then delivered it to Marcus directly in their weekly one-on-one and followed up with the written version by email the same day. The task was logged with the date handed off and the acceptance conditions above, so Dana had something to check against the next time a change order came up.

The first run surfaced one gap: the 12% variance line didn't account for change orders that were themselves corrections to an earlier mistake (re-doing drainage work that failed inspection). On the second run of the task, this got folded into a documented SOP per `references/documentation-rule.md`, with an explicit carve-out for correction work, and that SOP now replaces this brief for every future change-order approval on that crew.

Sources

Merged from the top existing skills on the topic, with credit to every input.

Frequently asked questions

Why does everything I delegate come back wrong?

Usually one of six things broke in the handoff: the outcome was described as activity instead of a result, you kept the real decision rights, the process only existed in your head, the inputs were incomplete, no single person was named accountable, or the tools and reporting expectations were never stated. Name which one broke before you redo the handoff.

How do I figure out what only I can do in my business?

Run the two-week test: list everything that would stall or slow down if you were unreachable for two weeks, restricted to tasks only you can do, access, or are trusted to approve. Score each item on customer trust, tribal knowledge, decision authority, and how much of your week it eats.

What should actually go in a handoff before I hand off a task?

A four-part brief: the outcome described as a finished result, one person named as accountable, the decision boundaries for what they can decide alone versus what comes back to you, and the acceptance conditions you'll check before calling the work done.

When do I write the SOP, right away or after it's run a few times?

Wait for the second time the task repeats. A task that has only run once still describes the exception, not the rule, so an SOP written that early usually documents the wrong thing.

How often should I redo this audit?

Every quarter. The dependency map isn't a one-time list, it's something you keep updating as tasks move off your plate and new ones land on it.

I can't take a vacation without the business falling apart, where do I even start?

Start with the two-week dependency list, not the vacation plan. Fix the highest-risk, most customer-facing items first, since those are what actually breaks when you step away.